Rettenmeier Wilburgstetten New sawmill waste system in operation
The Rettenmeier Group has built a new sawmill with a capacity of 1.2 million cubic metres at its headquarters in Wilburgstetten (Bavaria). It is located adjacent to the existing sawmill there which has a cutting capacity of 500,000 cubic metres. After cutting started on 22 March, output was ramped up to around 65,000 cubic metres per month in two-shift operation by the end of June.